Silver wing

Liège-Guillemins railway station...
The new station by the architect Santiago Calatrava was officially opened on 18 September 2009. It has 9 tracks and 5 platforms. All the tracks around the station have been modernised to allow high speed arrival and departure.

The new station is made of steel, glass and white concrete. It includes a monumental arch, 160 metres long and 32 metres high.

Silver wing

Liège-Guillemins railway station...
The new station by the architect Santiago Calatrava was officially opened on 18 September 2009. It has 9 tracks and 5 platforms. All the tracks around the station have been modernised to allow high speed arrival and departure.

The new station is made of steel, glass and white concrete. It includes a monumental arch, 160 metres long and 32 metres high.

afbeelding van gilclaes

GilbertClaes

Bekijk profiel

Foto informatie

Categorie(ën): Architectuur
Datum geupload: dinsdag, mei 16, 2017 - 12:37